• 1-855-551-4885
15
Dec

Bob Hope Dining Facility

Client US Military Challenge Immediate requirement for a 50,000 sq. ft. dining facility to be located in Baghdad, Iraq. Must be engineered to withstand temperatures in excess of 120F as well as frequent high wind sand storms. Solution 88.6′ wide by 500′ long Sprung Structure Time-line Delivery Time – Delivery 4 weeks from order. Construction …

15
Dec

Cold War Exhibit – The Military Museums

Client The Military Museums, Calgary, Alberta, Canada Challenge The Military Museums were looking for exhibit space for their Cold War Exhibit, marking the 40-year Cold War in which Canadian airmen roamed the skies. The exhibit space needed to accommodate a CF-18 Hornet, a CF-104 Starfighter and an F-86 Sabre aircraft. Overall project costs were critical …

15
Dec

FedEx San Diego International Airport

Client FedEx Challenge FedEx needed to increase capacity and productivity at the San Diego airport and was looking for an immediate, cost effective solution. Solution 70′ wide by 225′ long Sprung structure: membrane terminated at 12’ height, erected on the tarmac in the secured section of the San Diego airport. Time-line Construction – 4 weeks …

15
Dec

Mini of Wichita

Client Wichita Luxury Group Challenge When the Mini Cooper dealership for the Wichita area was awarded to the Wichita Luxury Group, the management team wanted to be operational, selling automobiles long before a permanent dealership could be completed. Solution This 30’ wide x 90’ long Sprung structure features a spacious clearspan interior incorporating natural daylight …

14
Dec

Salvation Army – Hurricane Katrina Disaster Recovery

Client The Salvation Army Challenge After the devastation of Hurricane Katrina, the Salvation Army needed an immediate on site presence to assist with disaster recovery in the Gulf Region. Solution Sprung was able to provide several 11,200 sq.ft. structures complete with engineered interior partitions. This enabled the Salvation Army to provide a variety of services …

9
Dec

Dartmouth College Student Center

Client Dartmouth College, New Hampshire Challenge Dartmouth College was looking to add a cutting edge, cost effective and energy efficient building solution for study groups, small club events and a casual place for the students to unwind. Solution 60’ wide by 75’ long Sprung Structure Student Center. Results The high tech look of the Sprung …

9
Dec

Hartsfield-Jackson Atlanta International Airport

Client Hartsfield – Jackson International Airport Challenge The Hartsfield-Jackson Atlanta International Airport recently undertook a thorough review of all of their fire stations and determined that each of their fire stations needed extensive renovations. Solution 70’ wide x 75’ long & 60’ wide x 60’ long Sprung Structure. The Atlanta airport decided that the best …

8
Dec

Oyu Tolgoi Mine

Client Rio Tinto / Oyu Tolgoi Project Challenge To procure an immediate solution for warehousing in Mongolia with high wind loads and extreme temperature variations. Solution 36m x 140m (120′ x 460′) Sprung structure. Complete with 23 cm (9 inch) thick insulation package Time-line Delivery – 4-6 weeks from order Construction – Winter construction conditions …

8
Dec

James Madison University Interim Dining Facility

Client James Madison University Challenge With a 2 year construction project in the works to replace the Gibbons Dining Hall, originally built in 1964, it was determined that the best course of action was to build an interim dining facility immediately so that the University could continue to attract students and provide a high level …

7
Dec

Shawnigan Lake School Ice Arena

Client Shawnigan Lake School is the most prestigious boarding school in Canada. Located on Vancouver Island, Shawnigan was established in 1915 and provides students with the very best in academics and sports. Challenge With the popularity of hockey, Shawnigan decided to make a significant investment by building an arena on campus in order to elevate …