Martensville Athletic Pavilion
15
Apr

Client

  • The City of Martensville, Saskatchewan, Canada and The Saskatchewan Board of Education and the Prairie School District

Challenge

  • The community needed an athletic facility with a dual purpose: it would be used by the city as well as the local high school. Speed and cost were prime factors in determining the best solution.

Solution

  • A 140′ wide by 290′ long Sprung Structure provides a state of the art, dynamic building solution that houses three full size basketball courts, upper running track, fitness area, multi-purpose offices and concession.

Time-line

  • Construction – The fall of 2013 structure was erected and enclosed quickly so that the interior of the building could be worked on while being protected from the outside elements. Opened in the fall of 2014

Project Cost

  • Less than $10 million dollars

Results

  • The Sprung structure was completed on time and on budget. Due to the cost-savings of not having to build a separate gymnasium at the local high school, the city was able to add a 500 – person theater that is used for the high school during the day and the community at night.

This Sprung Structure Features:

  • 50,000 square feet of space in an insulated structure
  • Translucent daylight panels, adding natural daylight to the playing areas.
  • 1 rolling service door and 2 Single Personnel doors.
  • 3 full-size basketball courts.
  • 3 full-size volleyball courts or six cross-courts.
  • 12 badminton courts.
  • Fitness area with weights and cardio equipment.
  • Multi-purpose rooms for martial arts and yoga, dance, etc.
  • 4-lane 200 meter running track (cleated footwear allowed).
  • Artificial turf is available to cover individual courts or the entire gym floor.
  • 10 individual team rooms.
  • Reception area.
  • Office
  • Concession