Tsunami 2009 Recovery – American Samoa Schools

Tsunami 2009 Recovery – American Samoa Schools
8
May

Sprung’s reputation for design and delivery were called upon for twelve – 30′ x 60′ structures to replace schools on American Samoa that suffered wide spread damage caused in the September 29th Tsunami.

With structural design requirements that demanded 140 MPH wind loading as per IBC 2006. Sprung shipped all 12 structures complete with an 8″ fiberglass insulation package and Tedlar coated membrane within 6 days from order.

Testimonial

“I wish you all could have been there to see the Samoan children’s faces and their smiles sitting in the new dining room and in their new classrooms with air conditioning, it was awesome and gratifying and gave everyone from FEMA the feeling that “we all made a difference”.