Client
- DaimlerChrysler Corporation, Brampton, Ontario, Canada
Challenge
- DaimlerChrysler’s testing facilities require regular modifications and upgrades. Conventional construction was ruled out in order to maintain flexibility of location and layout for the proposed enclosed test track. At the same time, precise environmental and climate control was critical to ensure accuracy and consistency of test results.
Solution
- 35,000 square foot Sprung structure
Results
- The enclosed test track facility provides a year round, all weather solution that can be completely relocated or modified as necessary.