Client
- Rio Tinto / Oyu Tolgoi Project
Challenge
- To procure an immediate solution for warehousing in Mongolia with high wind loads and extreme temperature variations.
Solution
- 36m x 140m (120′ x 460′) Sprung structure. Complete with 23 cm (9 inch) thick insulation package
Time-line
- Delivery – 4-6 weeks from order
Construction – Winter construction conditions
Results
- This Sprung structure warehouse was used to start a new phase of the Oyu Tolgoi project.Grand opening was attended by the President of Mongolia as well as the CEO of Rio Tinto.