Ir al contenido

Proyectos

Industrial | Obras Públicas

Jordan School District – Bus Maintenance

Jordan School District

Reproducir vídeo

Pregunta

The City of South Jordan public works facility, was currently housed in a Sprung Structure. Learning that the public works facility was scheduled to be dismantled and land repurposed, the Jordan School division purchased the structure and relocated it to the present site.

Cómo se entregó Sprung

A new Dupont Tedlar membrane was added to provide a new exterior look that fits well in the surrounding community. The relocatable design of the Sprung structure provided a cost effective environmentally friendly building solution. 

This fully insulated structure features a four 9000 cfm exhaust ventilators, two end sliding cargo doors  and
translucent panels in peak provide an optimum amount of daylight that provides an enhanced working environment while lowering operating costs.

Testimonio

“This structure has exceeded our expectations.”

Herb Jensen
Director of Transportation
Jordan School District

Especificaciones

Inicie su proyecto
Planee su estructura

Hablemos

Suscríbase a nuestro boletín informativo