تخطي إلى المحتوى

المشاريع

الصناعية | الأشغال العامة

Jordan School District – Bus Maintenance

Jordan School District

تشغيل الفيديو

الطلب

The City of South Jordan public works facility, was currently housed in a Sprung Structure. Learning that the public works facility was scheduled to be dismantled and land repurposed, the Jordan School division purchased the structure and relocated it to the present site.

كيف سلمت سبرنج

A new Dupont Tedlar membrane was added to provide a new exterior look that fits well in the surrounding community. The relocatable design of the Sprung structure provided a cost effective environmentally friendly building solution. 

This fully insulated structure features a four 9000 cfm exhaust ventilators, two end sliding cargo doors  and
translucent panels in peak provide an optimum amount of daylight that provides an enhanced working environment while lowering operating costs.

شهادة

“This structure has exceeded our expectations.”

Herb Jensen
Director of Transportation
Jordan School District

المواصفات

ابدأ مشروعك
خطط هيكلك

تحدث معنا

اشترك في نشرتنا الإخبارية