Con una próxima conferencia sobre el Pacífico Sur y el Norte de África programada en Warwick Le Lagon, el personal determinó que el espacio de conferencias existente era demasiado pequeño para satisfacer las crecientes necesidades del complejo. Por lo que era necesaria una nueva estructura.
Cómo se entregó Sprung
After an extensive search for a quick solution, Sprung was selected to supply an engineered structure that could be constructed over a three-month schedule and meet the country’s strict building code requirements — the structure had to be able to withstand seismic activity as well as cyclone wind loads of over 125 miles per hour. Sprung delivered a fully insulated 90’ x 120’ structure that includes a specially designed, temporary dividing wall, which allows for the creation of smaller conference rooms within the space.
Especificaciones
- 90' de ancho por 120' de largo
- Engineered to meet 136 mph - 227 kph