La demande
Alors qu'une conférence sur le Pacifique Sud et l'Afrique du Nord était prévue au Warwick Le Lagon, le personnel a constaté que l'espace de conférence existant était trop petit pour répondre aux besoins croissants du complexe. Une nouvelle structure était nécessaire.
Comment Sprung a été livré
After an extensive search for a quick solution, Sprung was selected to supply an engineered structure that could be constructed over a three-month schedule and meet the country’s strict building code requirements — the structure had to be able to withstand seismic activity as well as cyclone wind loads of over 125 miles per hour. Sprung delivered a fully insulated 90’ x 120’ structure that includes a specially designed, temporary dividing wall, which allows for the creation of smaller conference rooms within the space.
Les spécifications
- 90' de large par 120' de long
- Engineered to meet 136 mph - 227 kph