ザ・アスク
When a massive flood in 2013 severely damaged Elbow Park School and forced it into a major rebuilding project, 200 students had to be temporarily relocated to modular classrooms, which were erected at a nearby school. An interim gymnasium facility was also required for the displaced students. Faced with the challenge of providing an appropriate space that could be constructed efficiently and affordably, representatives turned to Sprung for a reliable solution.
スプラングの納品方法
Sprung designed and delivered a fully insulated 60’ x 60’ structure, which was rapidly installed alongside the interim classroom facilities. Featuring a Salem Blue Kynar architectural membrane with daylight panels in the peak, the clear-span structure provided a bright, unobstructed space for Elbow Park students to continue their physical education activities while their school underwent reconstruction. A Sprung Shield was added to the structure’s exterior for additional protection against potential vandalism.
スペック
- 幅60フィート×長さ60フィート
- 完全断熱
- ピーク時のデイライトパネル
- Sprung Shield
