Die Frage
Angesichts einer bevorstehenden Konferenz über den Südpazifik und Nordafrika, die im Warwick Le Lagon stattfinden sollte, stellte das Personal fest, dass der bestehende Konferenzraum des Hotels zu klein war, um den wachsenden Anforderungen des Resorts gerecht zu werden. Eine neue Struktur war notwendig.
Wie Sprung geliefert hat
After an extensive search for a quick solution, Sprung was selected to supply an engineered structure that could be constructed over a three-month schedule and meet the country’s strict building code requirements — the structure had to be able to withstand seismic activity as well as cyclone wind loads of over 125 miles per hour. Sprung delivered a fully insulated 90’ x 120’ structure that includes a specially designed, temporary dividing wall, which allows for the creation of smaller conference rooms within the space.
Die Specs
- 90' breit und 120' lang
- Engineered to meet 136 mph - 227 kph