Industrial | Aviation and Aerospace

SWA – Kansas City International Airport

Kansas City International Airport

Play Video

THE ASK

As Kansas City International Airport underwent a series of major renovations, Southwest Airlines needed an interim baggage handling facility on-site. Having collaborated with Sprung on a number of projects throughout the United States in the past, executives at Southwest knew Sprung could once again provide them with a fast, flexible and cost-effective solution.

HOW SPRUNG DELIVERED

Sprung designed and delivered a fully insulated 90’ x 130’ baggage facility building. A key feature of the temporary facility was its conveyor system, which extended from the airport’s conventional terminal building into the Sprung structure. Not only did this conveyor need to be covered, it also had to cross a traffic lane used by baggage tugs. To ensure baggage would flow without issue, Sprung engineered a large opening (measuring 19’ x 7’6’’) to allow for tug traffic to run underneath the protected conveyor.

THE SPECS

Start Your Project
Plan Your Structure

Let’s Talk

A New Chapter Begins

After 138 years serving Southern Alberta, Western Tent would like to announce that our operations are being absorbed by our larger conglomerate, Sprung Structures. As we move forward, many of the products we’ve offered over the years—including residential and commercial awnings, canopies, tents and custom shelters—will no longer be available.

Thank you to all of our loyal and valued customers. Your trust and support over the years have meant the world to us. We invite you to visit www.sprung.com to see what the company’s future holds under the Sprung name.

With gratitude,
The Western Tent Team
WTA@sprung.com